Missing targets

Saturday, November 27, 2021

I fully intended to get back to my appliqué stitching last night after supper but there are two new seasons of Blacklist and I’m afraid that and my knitting won out. I managed to get a hat and scarf set finished so I still felt like I accomplished something.

The plan was to get up early this morning, get the stitching done and have the quilts at the Guild by nine. That target came and went and then I thought I’d have them ready for eleven. That target also passed but I managed to get them to the Guild by noon. My plan was to have lunch with the group but they weren’t even thinking of lunch yet so I dropped my five tops and came back home.

This afternoon I’ve been working on one of my three-yard quilts. I almost have the first two steps finished; I think they will take the longest because I had to make 48 HSTs and then put together 24 blocks. The rest of the pattern looks to be some strip piecing and cutting to size.

There weren’t very many at the Guild today so I plan to go in to sew tomorrow.