Switching up the schedule

Thursday, February 4, 2021

I was scheduled to be quilting a UFO today but I just can’t leave those log cabin quilts alone. I know I put off quilting whenever possible but I’m switching up the schedule so I’ll have a couple of days of quilting time in a row.

I’m still a long way from having my 28 blocks done – I think four are finished – but I keep going around and around adding a log onto the right, then the bottom, then the left and then the top. And you know the issues I have with left and right (and even top and bottom when reading from the pattern) so I’m taking it very slow. I have enough blocks done to know that the pattern is going to work out the way I wanted it to.

I’ll spend another day on the log cabin blocks and, if there is time, I’ll get back to my scrappy quilt leaders and enders. I’ll move cross stitching up to Saturday and I’ll quilt on Sunday and Monday.