Friday, August 12, 2022
I am ever so slowly catching up on my task list. With this week’s finish of Ashford Square I have completed everything that was listed on my January UFO list. The quilt with Mum’s fabric is done (scrappy), the Guild Challenge placemats that were supposed to be done for June are ready to quilt (piecing) and Gavin’s Log Cabin was ready in time for his birthday in April (quilting). Now, on to February’s list!
It has been awhile since I spent any time out in the yard. It was cooler today so Pat and I worked outside most of the morning. He pulled a few weeds and sprayed one side of the patio with weed killer; I cleared the weeds from the other side of the patio. I’ve more or less given up on the gardener as far as helping with the weeding; I’m okay with that as long as he will do the blackberries in the rose wall and keep the boulevard mowed.
After lunch I came upstairs and got a card top finished. I thought this was going to be the last one from the book but there is one more to do. I have lots of cards required for September so I expect I’ll get to that last one soon. Last night when I unwrapped my Sashiko sampler I was disappointed to see I have four more sections to do, not the two I thought there were. I know math can be an issue for me but I used to know how to count!
I’ve been making phone calls this afternoon lining up leaders for the Guild classes and demos. All but one have been settled but I had to do some convincing for a couple of the sessions.
I’ll head downstairs now and do some more work on my sampler.